Friday, September 12, 2008

Bathroom Renovation












The job started on Labor Day, how appropriate. So long to the bathroom that could never be clean enough because it was so old and missing finishes, etc. We're still bathing from buckets and the kitchen sink, but it will be well worth it in the end. I can't wait for the dust and chaos to cease. Do you see that pipe? Can you believe we didn't have a massive flood. We are certainly blessed. There were 2 pipes with terrible holes. There was so much gunk built up in them that it acted as a seal.
We included a picture of Charles. He's been great through this whole process. The house was built in 1946, when plaster walls were the standard. So b/c of the banging on the walls, we now have to fix my bedroom closet where there's a big chunk of wall missing and the office wall where it looks like someone punched it and the cracks just spread all over while it's bowed out. Those blasted plaster walls!! *&#$*@*&$# Sorry, had to get that one out. I hope to take more pics. We have walls now and Charles is working on laying the tiles on the floor as I type this. 

No comments: